CEDAR FALLS COMMUNITY HIGH SCHOOL

The new Cedar Falls Community High School, a 305,000-square-foot facility, marks a major milestone for the district, culminating years of planning, collaboration, and thoughtful design. Rippe Associates’ involvement began with a district-wide foodservice masterplan, which took a holistic view of operations across all schools. The shift from a centralized production model to independent school-based preparation prompted the renovation of four elementary schools in advance of the new high school’s construction. This transformation led to a 20% increase in student meal participation and significantly improved food quality and variety across the district.

The foodservice program at Cedar Falls High School was designed to meet both operational and experiential goals. A scattered servery layout with multiple production-supported stations was key to ensuring fast, efficient service during peak lunch times, while creating a collegiate-style environment for students. A student-run coffee shop, culinary arts kitchen for the FACS program, and multiple concessions locations- including those supporting the gymnasium, football stadium, and aquatics center- extend foodservice well beyond the traditional cafeteria model. The main kitchen serves as the hub for cold prep and baking for the entire district, and also houses central dry and frozen storage to support the renovated elementary schools.

Efficiency was a priority in every design decision. Heated and refrigerated pass-thru units connect the kitchen to the serving area, allowing staff to focus on service without disruption. Storage areas are organized for efficient backloading and streamlined distribution to satellite schools. Cold prep areas were given more square footage than hot prep, based on the menu strategy and production volume. In the serving areas, key equipment like double-stacked conveyor ovens and speed impingement ovens allow for quick, high-quality production of student favorites such as pizza and toasted subs.

Budget-conscious decisions were made throughout the project, including planning for future equipment purchases—such as a second rotating rack oven that was added within the first year of operation. Sustainability was also a core value, with features such as low-volume exhaust hoods, an energy recovery dish machine, Energy Star equipment, and low-flow fixtures. Having been deeply involved in the district’s long-term planning, Rippe Associates was uniquely positioned to deliver a foodservice solution that enhances student experience, supports evolving program needs, and increases operational efficiency from elementary through high school.

DETAILS

Location: Cedar Falls, IA
Opening Date: August 2024
Equipment Cost: $1,800,000
Football Concessions: $250,000
Servery & Kitchen: 9,600 SF
FACS Lab: 1,600 SF
Gym Concessions: 560 SF
Tiger Den Coffee: 350 SF
Football & Aquatic Concessions: 2,200 SF

Awards:
Green Good Design Awards 2025
IIDA Great Plains “IDEA” Awards 2025

SCOPE

Foodservice planning and design including a multi-station cafeteria, central cold prep and baking kitchen, district-wide warehousing, and multiple concessions and retail spaces.

“frk has had the good fortune to with Rippe Associates for more than 20 years on many projects together. Our focus is the K-12 market and we have always appreciated the deep knowledge base, attention to detail, and extensive experience the team at Rippe Associate provides for educational design. We have also greatly valued the professional, yet personal approach, their designers take with our clients. When working with Rippe, we are always confident the project will be a success!”

Thomas C. Wollan, AIA, LEED AP

Partner at frk architects + engineers

“When it comes to dietary planning, Rippe is always first on my list when team building. They have a strong understanding of all the issues, are creative problem solvers, and are consistent with their execution.”

Daniel J. Rectenwald, AIA, ACHA, NCARB

Vice President, Principal at HGA

"The development of Elmhurst Hospital’s replacement campus was complex. The Rippe team supported our vision to transform healthcare foodservice. The result was exceptional reviews from our patients and staff, along with a facility that supported efficient operations."

David E. Reeves

Past President of the Association for Healthcare Foodservice (AHF)

Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Slide Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here

STAY IN TOUCH

Enter your email to receive the latest Rippe news and insights.

CONNECT

10400 Yellow Circle Dr, Ste 100
Minneapolis, MN 55343

Front Desk: 952.933.0313
info@rippeassociates.com